


It is the case where you have Ericsson 2206 with MPB and Sunlight. Select ConfigurationàDefineàAlarm Inlets… The dialog to define external alarms will be shown.

Save IDB in you computer before step forward. In our case it is SCC (Site Cell Configuration) 3x2 and No of Ant 3x2. From here select the configuration of the RBS. Frequency: GSM 900 (other options GSM 800, GSM 1800, GSM 1900) CDU type: CDU G (other options CDU F) TMA: No (other options Yes) Tx combining: Uncombined (other options dTRU hybrid combiner, HCU, HCU_RX antenna sharing) Create a new Antenna Sector by clicking on Newīy clicking New a new window Antenna Systems for Sector 0 will be shown. Here we will discuss the usual configuration with 3 cell of 900MHz without TMA. Now it is time to create the cells for the cabinet. 2206 Cabinet Type: 2206 Power System: -48VDC (Also +24VDC, 120-250VAC optional backup) Climate System: Fan+Filter 2106 Cabinet Type: 2106 Power System: 200-250 outdoor battery Air. If you have created already a new IDB and want to erase it click on Clear All. Let transmission line G.703 and create type of cabinet by clicking on New. Don’t connect to RBS but create first the IDB. All internal cables of the cabinet are connected and there is no obvious sign of damage. Neutral and grounding are not connected on the same bar. In case of 2106 power cables are connected correctly on power board. Cabinet is well fixed and grounded DC voltage to cabinet is -48VDC (be careful of the polarity).Serial cable 9pin male - 9pin female for connection.īefore begin the commissioning make some last checks. The latest version of OMT (currently it is R29_3). Laptop more than 1000MHz, 512MB memory, WinXP or Win2000. Torques for plug-unplug units (if needed) Screwdriver and krone-tool for installing PCM line (if needed).The commissioner before go to site for commissioning, he must have the following materials with him:
